Future Development
Auto Punch form Population
With the potential to use the IOM to scan the forms returned from the engineers’ inspections it should be possible to auto generate the Punch Form detail by recognising the test that failed from the form and the position on the form. The forms can be generated from a library of checks held in the CMS. This automation will also provide stats for fault analysis.
Pre Comm hours
Since we know the tag type of each tag, if provision is made for an estimate of the Pre Comm hours for the tag type then it should be straightforward to estimate the total man hours for parts of the project and generate plan/actual s-curves illustrating the completion status of the project.